Turnkey Office Fit-Out or Separate Contractors: Which One Avoids Cost Overruns?

admin2

26 November 2026

Planning Guide

Turnkey office fit-out or separate contractors? Compare cost, schedule and warranty, plus 7 checks for a genuine turnkey package and a free 48-hour Test Fit.

A turnkey office fit-out puts one company in charge of the whole chain: drawings, costing, construction, handover and warranty, under one contract and one point of contact for problems. Hiring separate contractors is the opposite. You sign with a different company for each trade, and the person who joins those pieces together is you. Both routes work, but the real cost, the real schedule and the party responsible when something goes wrong are very different. This article compares the two on each criterion so you can choose the one that suits your floor plate.

Glass-walled meeting room at the SSOE office after completion and handover

What does a turnkey office fit-out include?

A genuine turnkey package covers seven groups of work, from before the drawings exist to after handover:

  • Consulting and Test Fit: checking the floor plate and laying out seats, meeting rooms and support areas before you sign the lease.

  • Design: concept, construction drawings, visuals, and drawings for power, air conditioning and lighting.

  • Costing (BOQ): a bill of quantities with unit rates per item that you can check against at acceptance.

  • Building procedures: the fit-out permit application, registration of workers and materials, and the safety method statement.

  • Construction: ceilings, partitions, flooring, painting, fixed joinery, low-voltage systems, electrical, air conditioning and fire protection.

  • Acceptance and handover: inspection against drawings, closing out defects, and handing over as-built records.

  • Warranty and maintenance: one point of contact for defects after handover.

The phrase that matters is "one contract". If a "turnkey" quotation shows a single lump sum without a detailed BOQ, you have nothing to check it against. How to read a bill of quantities is explained in how to read an office fit-out quotation (BOQ).

Separate contractors: you become the main contractor without a main-contractor contract

When you split the work, an office of a few hundred square metres can end up with six to eight parties: a designer, a ceiling-and-partition contractor, an electrician, an HVAC contractor, a fire-protection company, a furniture supplier, a network and CCTV installer, and sometimes a signage vendor. Each has its own quotation, schedule and warranty process. The person who coordinates site access, checks that one trade does not collide with another, and signs off each package is the business owner or an administrative staff member doing it on the side.

Diagram comparing the number of parties involved in separate contracting versus turnkey fit-out

The number of parties does not sound large, but it multiplies the number of meetings, hand-offs and places where two drawings can disagree. The next section covers the four mismatches that appear most often.

Four sources of extra cost when you split the work

Drawings that do not match each other

For example, the designer draws a finished ceiling at 2.7 m, but the HVAC contractor needs a deeper void for ducts than expected. Both drawings are correct within their own scope; nobody checked them overlaid. If this is discovered once the scaffolding is up, lowering the ceiling or rerouting ducts costs more money and more days. In a turnkey package, architectural, electrical and HVAC drawings are coordinated in one set before construction starts.

Overlapping work sequences

A plasterboard ceiling can be closed only after the ducts and cables above it are installed and inspected. Floor finishes go in only after heavy, dusty and wet work is complete. If each contractor sets its own schedule, clashes happen more often than you would expect: the painter arrives before the electrician has fitted switch boxes, or the flooring crew waits for the ceiling crew to clear the scaffolding. A main contractor holds a master schedule and is accountable for it.

Drywall partition framing being erected with ducts and services above the ceiling on the IVB project

When something fails, each party owns only its part

Air conditioning drips onto a newly closed ceiling. The HVAC contractor says the ceiling was built with the wrong fall; the ceiling contractor says the drain pipe was installed wrongly. You are in the middle. Under a single contract, responsibility for the fix and its cost sits with the contracting company, and assigning fault to a subcontractor is an internal matter for them.

Procedures with building management

Many office buildings require the fit-out contractor to submit company documents, a worker list, a safety method statement and a restoration undertaking in its own name; the details differ by building. With several contractors, each may need to submit separately, or the building may ask you to appoint a lead contractor. The process and paperwork are covered in fit-out permits from building management.

Five-criteria comparison

1. Visible cost. Separate contracting often produces lower line-item quotes, because a specialist carries less management overhead. But what you actually spend includes the coordination you do yourself, the money spent fixing mismatches between trades, and time spent waiting. Compare total cost at handover, not individual quotation lines.

2. Schedule. A turnkey contractor has one master schedule and one party accountable for it. With separate contractors, the schedule depends on how closely you follow up and whether each trade arrives on the agreed day. One contractor running two days late can push everything after it.

3. Consistency of quality. Specialists are strong within their trade. The risk sits at the boundary between trades: the junction between ceiling and lighting, grille positions relative to lights, floor-box height relative to the finished floor.

4. Warranty. Turnkey gives you one warranty commitment and one place to report defects. Separate contracting gives you several commitments, each with its own conditions, and you need to know which trade a defect belongs to before you can call the right party.

5. Risk management. Turnkey transfers most coordination risk to the contractor, in exchange for management cost built into the rates. Separate contracting keeps the risk with you, in exchange for direct control over each rate.

When is separate contracting the right choice?

Separate contracting is not wrong. It suits small, self-contained jobs: repainting, replacing flooring, adding a few glass partitions, with no changes to power or air conditioning. It also suits companies that already have an in-house technical or project management team able to read drawings and accept work package by package. For floors of a few hundred square metres or more that need new electrical, HVAC and fire-protection systems, coordination is the most labour-intensive part of the job, which is why many businesses go turnkey.

Seven checks to confirm a package is genuinely turnkey

  1. A detailed BOQ by item, not only a total.

  2. Whether fire protection, low-voltage and air conditioning are inside the quotation or marked "owner to arrange".

  3. Which party bears building management fees and deposits.

  4. A weekly schedule with milestones, plus the conditions for handing over the site and for pausing the programme.

  5. How variations are handled: who approves them and where the unit rates come from.

  6. Whether acceptance records and as-built documents are part of the handover scope.

  7. The warranty period, the point of contact for defects, and the committed response time.

If a "turnkey" quotation cannot answer three of these seven, it is turnkey in name only. Common traps in quotations are analysed further in office fit-out quotation 2026.

VIB office floor at rough stage with slab under works and no finished partitions or ceiling

Reference figures from Enter Office

Enter Office publishes its fit-out cost ranges in three tiers: Basic at 3.5 to 5.5 million VND/m², Mid-range at 5.5 to 8 million VND/m², and High-end from 10 million VND/m². The design fee for floors under 100 m² is 280,000 VND/m². These are reference ranges; the final cost depends on site condition, building requirements, density of technical systems and materials.

On schedule, the Dong Do Partners Hong Ha branch (Ho Chi Minh City) covers 200 m² and was built in 18 days, while the Dong Do Partners office in Hanoi covers 175 m² and was completed in 3 weeks. Both followed the Design & Build model, where one team is responsible from drawings to handover. Durations by project size are covered in how long does an office fit-out take.

Multi-purpose area with exposed concrete ceiling and services at the Dong Do Partners Hong Ha branch office (Ho Chi Minh City), 200 m² built in 18 days

The turnkey process

  1. Intake and survey: receive drawings or measure the floor, record building requirements and headcount needs.

  2. Test Fit: a preliminary layout to confirm seat count and functional zones.

  3. Design and costing: concept, technical drawings and a BOQ for the client to approve.

  4. Construction: run to a master schedule with weekly progress reports and acceptance by package.

  5. Handover and warranty: as-built records, system training, and defect handling after handover.

For this chain presented as a process with guidance on choosing a contractor, read turnkey office design and build: process and how to choose a contractor.

Get a free Test Fit plan before you decide

Considering a space but not sure how many people this floor area can seat? Not sure what the fit-out will cost? Send your CAD or PDF floor plan to Enter Office – we will prepare a FREE Test Fit plan (a preliminary space layout) within 48 hours so you can make the most accurate decision.

Register for a Free Test Fit Plan · Send Your Floor Plan Now

Frequently asked questions

Is a turnkey office fit-out more expensive than separate contractors?

Line-item rates in a turnkey package can be higher because management and coordination are priced in. Compare total spending at handover, and add the coordination you would do yourself, the money spent when trades do not line up, and the time the office cannot operate.

Can I go turnkey on part of the work and buy loose furniture myself?

Yes. Many businesses hand over design, construction and technical systems as a package while their procurement team chooses desks, chairs and equipment. The contract should state the boundary: who installs, and who is responsible for socket heights, power positions and space allowances.

Should a turnkey contract fix the price or follow measured quantities?

For drawings that are final, the price follows a fixed BOQ for the quantities stated. Variations caused by changed requirements or conditions revealed during demolition should use unit rates agreed in the contract and be confirmed in writing before the work is done.

At what floor area should I choose turnkey?

There is no fixed threshold. The clearest signal is that you need new or changed electrical, air conditioning or fire-protection systems, because that is where coordination volume is highest. For repainting or replacing flooring, separate contracting is still reasonable.

Conclusion on turnkey office fit-out

Choose turnkey to exchange a management cost for one party responsible from drawings to warranty. Choose separate contracting when the job is small and self-contained, or when you have a technical team able to coordinate it. Either way, ask for a detailed BOQ, a milestone schedule and the warranty scope in writing. If your floor is still at the lease-evaluation stage, sending the plan to Enter Office for a Test Fit within 48 hours gives you a headcount figure and a cost range before you sign.